From the JobMemo team
Material delivery inspection checklist for a small job site
Check delivered materials against the order, record visible damage or missing parts, and write a clear discrepancy note with photos and follow-up.
A material delivery inspection checklist helps the receiving person record what arrived, what they could check, and what still needs an answer. Compare the delivered items with the relevant order, photograph visible discrepancies, and name the person following up before the information becomes scattered across messages.
This checklist concerns the receiving record. Product-specific inspection and handling requirements still belong in the supplier's instructions and your normal site process.
Prepare the reference before the delivery arrives
Have the job reference, order reference, expected items, and receiving contact available. Decide where the delivery record will be kept and who will contact the supplier about a discrepancy. If the person receiving the load is covering another worker's job, give them the actual item list rather than a description such as “the bathroom order.”
Separate three quantities: ordered, visibly received, and actually checked. A sealed box can be present while its internal contents remain unverified.
Work through the receiving checklist
- Confirm the delivery relates to the correct project and order reference.
- Record the delivery date and the person making the receiving note.
- Compare visible item codes, descriptions, sizes, or finishes with the order.
- Count the packages or items you can actually identify.
- Photograph relevant labels and any visible packaging or product damage.
- Record anything unopened, inaccessible, or otherwise not checked.
- Note where the affected items have been placed and who will follow up.
An undamaged outer package does not tell you everything about its contents. Write the scope of the check precisely and add a later note if a discrepancy becomes visible after opening. Avoid labelling a whole delivery “checked” when you counted only the boxes.
Photograph the discrepancy and its context
Take a view that identifies the item, a readable label where useful, and a detail of the visible issue. For a missing item, the written comparison with the order is central: a photograph of the delivered pile alone does not establish what should have arrived.
Keep unnecessary personal information on delivery paperwork out of photos intended for client sharing. Store business paperwork in your normal document system; JobMemo's photo and text record can refer to its order number without claiming to hold the document itself.
Copy this delivery discrepancy note
Project / delivery date: [reference and date]
Order / item reference: [identifier]
Expected: [description and quantity]
Received and checked: [what was actually observed]
Not checked: [sealed contents or other limits]
Discrepancy / photos: [specific issue and identifying views]
Effect on work: [task affected, if known]
Next action / owner: [supplier query or other action]
Next check: [date to follow up]
The following example is fictional:
Order JM058, cabinet handles
Expected eight handles in brushed finish. Seven handles counted after opening; one handle has a visible scratch on its front face. Count overview, package label, and scratch detail photographed. Rowan will send the discrepancy to the supplier today. Replacement availability is unconfirmed; fitting the complete set remains open.
Close the receiving loop
Add a new note when the supplier replies. Record whether a replacement, collection, or further check was actually arranged, and keep any proposal labelled until confirmed. When the replacement arrives, connect its result to the original item reference.
In JobMemo, add delivery photos and a text update to the relevant project. Use the photo documentation guide for location comments and the project checklist guide to track an outstanding receiving action.
Start a JobMemo project to keep delivery observations beside the work they affect.