From the JobMemo team
Painting job completion checklist for photos and final notes
Prepare a decorating job record with room-by-room completion views, touch-up references, access limits, and a clear final visit note.
A painting job completion checklist helps a decorating team describe what is finished and what still needs attention. Record each agreed room and surface, add comparable photos, and keep touch-ups or access limits in the final note. A wide room photograph can be useful without showing every edge or surface in the scope.
This checklist organizes the record of the job. Assess the work against the finish requirements and checks agreed for that project.
Start with the agreed room and surface list
Before the final visit, read the job's room list and any recorded changes. “Bedroom painted” may leave the reader unsure whether that includes the ceiling, walls, door, or woodwork. Use the same surface descriptions as the agreed scope.
Keep excluded surfaces identifiable. If the cupboard interior was never included, record it as outside the listed scope rather than as an unfinished task. If its status is uncertain, clarify that before preparing the completion summary.
Photograph the finished areas with useful context
Work through the following record checks:
- Take an overview of each room or agreed work zone.
- Add detail views where they help explain a finish or an outstanding item.
- Use room and surface names in every caption.
- Record surfaces hidden by furniture or unavailable for the final view.
- Identify touch-up items individually rather than calling a whole room incomplete.
- Add a final note describing the actual check and who performed it.
Use available lighting that lets the reader understand the view. If lighting differs from the original condition photos, mention it when making a comparison. A photograph should not be used to make a precise colour claim when the appearance depends on the screen and conditions in which it is viewed.
Give touch-ups their own references
Use an item such as “P-02, bedroom 1, window-side skirting” and explain the visible condition and next action. Repeat that reference in the later outcome note so nobody has to guess which mark the new photo addresses.
Avoid closing an item with just “sorted.” Record the work performed and what was checked during the return visit. If the client has not yet reviewed it, keep that response separate from the team's recorded outcome.
Copy this final visit note
Date / rooms: [visit date and areas reviewed]
Agreed surfaces completed: [specific rooms and surfaces]
Photos: [overview and relevant detail descriptions]
Check performed: [person, area, and result]
Outstanding items: [reference, location, and action]
Not reviewed / not visible: [limits]
Client communication: [what was sent and any reply still awaited]
The following example is fictional:
Front bedroom — final decorating visit
Listed wall and ceiling work finished. Doorway overview and window-wall views added. Pat reviewed the listed surfaces during the visit. P-02, window-side skirting touch-up, remains open because the area was behind stored furniture. Property contact will confirm when access is available. Completion summary sent; client reply awaited.
Save the record after the latest outcome
In JobMemo, add room comments to the final photos and a text update for the visit. Keep remaining actions in the project checklist, and update the record after the return visit before generating a fresh project PDF report. A downloaded report captures the state when it was generated, so an earlier copy will not acquire later touch-up notes.
Start a JobMemo project to keep decorating progress, final views, and touch-up outcomes in one job record.