A record to take with you

Turn the project record into a PDF you can keep.

A viewing link helps people follow a job. A downloaded PDF captures the project at a particular moment. JobMemo brings the photos and written context into a file you can save or send for a handoff.

Start your first project

What the project report includes

A JobMemo PDF report contains the project's name, address, description, status, organization and assigned team details, plus its photos and text updates. It also records when the report was generated and who generated it. Report dates are labeled UTC.

  • Embedded photos: the stored images are inside the PDF, together with their stage labels, comments, uploader names, and upload dates.
  • Problem flags: photos marked as problems are identified in the report so the reader can see the recorded issues.
  • Project checklist: item titles, optional due dates, and open or completed states are included as they stood when the report was generated. See the project checklist guide for how to maintain the list.
  • Text updates: notes and guest comments are included with their author labels and dates.

The report documents the project's current record. A Completed status and the presence of a report do not certify customer approval. Customer signatures and automatic completion reports are planned features.

See a sample project PDF

This four-page example follows a fictional valve replacement, from the initial leak to the repair check. It was generated with the same report renderer as JobMemo's project exports. Names and job details are invented; the embedded images are clearly labeled illustrations rather than site photographs.

Open the sample project report (PDF)

  • Page 1: project details, status, assigned team, and generation date.
  • Page 2: visit notes, the repair outcome, and a guest comment.
  • Pages 3 and 4: Before and After images with uploader names, dates, and explanatory comments. The Before image retains its original problem flag; the later note records the outcome.

In your own project, use actual site photos and describe what you checked. A note such as “Water supply restored; no leak observed at the valve connections during the visit” gives the reader more context than “Done.”

Prepare the project for a handoff

Use the construction project handover checklist to review completion photos, outstanding work, and the client update before you export.

Before exporting, check the project details and the update timeline. A reader who was not on site should be able to understand the work from the photos and notes.

  1. Confirm the project name, address, and description describe the correct job.
  2. Review the Before, In progress, and After photos. Add comments where the image alone does not explain the work.
  3. Check flagged problems and record the outcome or next action in a note.
  4. Review the project checklist, tick off finished work, and check any open items and due dates.
  5. Add a closing text update and set the project status to Completed if the work is ready to close.

Completed projects remain viewable but stop new photos and comments. Reopen the project if you still need to add something, then generate a new report after the record is ready.

For a standalone property callout, the maintenance visit report template helps organize the work completed, supporting photos, and follow-up items before export.

Download the report as a project admin

Open the project and choose Download PDF report. Report export is available to project admins. JobMemo gathers the record and embeds the photos into the downloaded file; the reader does not need a JobMemo login to open that file.

Report generation supports up to 500 photos and 45 MB of source images per report. If an image is unavailable, generation fails instead of silently leaving it out. Resolve the download error and try again before relying on the report.

PDF export is included in the Free plan along with photos, text updates, checklists, and client viewing links. Project, account, and storage capacity depend on your organization's plan.

Keep the downloaded file

Reports are generated on demand and are not stored in JobMemo. Save the downloaded PDF in your own files and give it a name that includes the job and handoff date. If you update the project later, download a new report to capture those changes.

Deleting photos or projects releases their storage capacity. Keep originals separately if your process needs the original uploaded files; the PDF contains JobMemo's optimized stored images.

Choose a live link or a saved snapshot

Use a client viewing link during the work when the reader needs the current project record. The shared gallery reflects later updates, and you can replace or revoke its link.

Use a PDF when you need a file that stays as it was when generated, such as an end-of-visit record or a final client handoff. You can revoke a viewing link, but you cannot revoke a PDF someone has already downloaded.

The best report starts with a clear job site photo record. Follow how JobMemo works to build that record from your first project onward.

Give your next job a clearer record.

Start with a Free account, document your first project, and try client sharing and PDF export.

Get started with JobMemo