For property maintenance teams
Keep a clear record of each maintenance visit.
A maintenance visit often ends with work completed, an item still open, and a next action. Give each visit a useful record so the office, the next worker, and the property contact can see what was documented.
Start your first projectChoose a project scope that matches the visit
For a standalone visit, create a project with the property, task, and visit date in its name. Add the address and a description of the reported issue. This makes a completed visit easy to distinguish from a later callout to the same property.
If several visits continue one repair, keep them in the same project and add a dated text update for each visit. Pick the approach that makes the work history easiest for the next person to read.
Each separate project counts toward your plan's project limit, including completed projects. Check the available plans when deciding how many individual records your team needs to retain.
Show the condition and the work performed
Add a Before photo that shows what you found, then record relevant changes using In progress or After photos. Include the room, location, or equipment in each comment so a reader can place a close-up.
A short written explanation can capture details the image misses, such as the reason a task remained open or the information needed before the next visit. Use the job photo workflow to keep these views connected to the right project.
Use a repeatable visit summary
Paste a short template into a Text update and fill it in before leaving the job. You can use the structure below for different property tasks without creating a separate form.
Visit: [date, property, and location] Reason for visit: [reported issue or planned work] Work completed: [what was done today] Photos: [starting condition and result recorded] Outstanding items: [what remains open] Next action: [who will arrange or complete the follow-up]
Text updates allow up to 2,000 characters. Keep the summary concise and use photo comments for image-specific context. The daily site report guide offers another structure for a crew recording several tasks in one day.
Record follow-up without losing the visit history
For a repeat fault, use this return-visit note template to record what you checked, what you observed, and the next action.
Mark a photo as a problem when it shows an item needing attention. Add a later note or photo to explain the outcome. If the same job needs another visit, leave the project open until its record is ready to close.
JobMemo stores the project record; visit scheduling and recurring work orders are not part of this workflow. Record the next action in a note and arrange the visit through your team's usual process.
Share the visit record and retain a copy
A project admin can use a client viewing link when the property contact needs the current record, or download a PDF report for a fixed copy of the visit. The PDF embeds the stored photos and includes the text updates.
Save and check the downloaded report before deleting a project you need to retain. Reports are generated on demand and are not stored in JobMemo. Marking a project Completed stops new photos and comments, while its existing record remains viewable.