For heating and cooling teams
Keep HVAC job photos and service notes together.
An HVAC job can span a first visit, an installation, and a return trip. Keep the equipment photos and visit notes in one project so the next technician and the client can follow what was recorded at each stage.
Start your first projectStart with the equipment and the reason for the visit
Create a project with a recognizable job name, the site address, and a description of the reported problem or installation scope. For a property with several units, include the room or equipment location in the description and photo comments.
Take an overview photo and the closer views that explain the condition you found. If equipment identification matters to the job, record it in a note or a readable photo. Label the starting condition Before so it stays distinguishable from later work.
Explain the installation sequence
Use In progress photos for meaningful stages of the job. Add a comment naming the unit, location, and stage shown. Include a wider view when a close-up would be difficult for another technician to place.
- Record the existing arrangement before the work changes it.
- Document intermediate work that will be less visible at the next stage.
- Add After photos that show the finished arrangement and a note explaining what was completed during this visit.
These are documentation prompts for your team. JobMemo provides photo labels and notes; your team chooses which records its work requires. See the photo documentation guide for the upload workflow.
Leave a useful note for the next technician
Choose Text update when the important information is a visit summary, a part still awaited, or the next action. Use the same project when the return visit continues the same job, and include the visit date in the note.
Visit: [date and equipment location] Work recorded today: [short summary] Photos added: [what the photos show] Still outstanding: [parts, work, or information needed] Next action: [who will do what next]
Keep observed conditions separate from work that is only planned. If a photo shows an issue needing attention, mark it as a problem and add context. The flag remains separate from its Before, In progress, or After label.
Give the client a clear update
A project admin can create a client viewing link for the job's photos, status, and text updates. Add a plain-language summary of the visit before sending it, including any work still to be recorded.
The link shows the shared project record, so review the photos and notes together. Guest comments are optional and disabled by default; an organization admin can enable them for an open project.
Close the job with a saved record
Review the photos and outstanding notes before marking the project Completed. Completion stops new photos and comments; reopen the project if another update is needed. A project admin can download a PDF report with embedded photos and visit notes. See the sample valve replacement report for a concrete example with Before and After images and a recorded repair outcome.
Save the downloaded file in your own records. Reports are not stored in JobMemo, and they document the project as it stood when generated. For separate routine visits, use the maintenance visit workflow; for a first setup, follow the JobMemo walkthrough.