Existing finish protection record for renovation work
Document agreed protection of floors, doors, and other retained finishes with location photos, changes during work, and a clear removal record.
An existing finish protection record shows what the crew put in place around retained surfaces and how that arrangement changed during the job. Keep the starting condition, the installed protection, and the later removal observations distinct. A photo taken after protection is installed cannot show the condition of everything underneath it.
The record describes the arrangement selected for the job; choosing suitable protection and checking product compatibility remain part of the team's working method.
Identify the retained finish precisely
Use room and surface references such as “hall floor from entrance to kitchen” or “inside face of study door.” Note visible starting marks with overview and detail images where appropriate. Do not describe a surface as unmarked if it was obscured or not checked.
Record what area was protected, when, and by whom. Keep packaging or product references in the normal materials record if the chosen protection needs to be identified later.
Record coverage and changes during the work
- Photograph the arrangement with enough surrounding detail to locate it.
- State any areas outside the recorded coverage.
- Note when protection was lifted, moved, or replaced during the job.
- Add a new observation if another trade changes the arrangement.
- Record who is checking an unresolved concern.
A photograph of one doorway does not establish the condition of the whole route through the building. Keep wording matched to the photographed area and actual checks.
Use a three-stage entry
Location / retained finish:
Starting condition / observations / areas not checked:
Protection installed / date / area covered:
Changes while work proceeds:
Protection removed / date / by whom:
Visible condition after removal:
Open observation / next action:
The following example is fictional:
Hall floor, entrance to kitchen. Existing mark beside kitchen threshold recorded before covering. Protection photographed in place Monday. Threshold section lifted for delivery Tuesday and replaced afterward. On removal Friday, threshold detail photographed again; area beneath remaining stored boxes not yet checked.
The last sentence gives the next person a specific limit instead of implying a complete final inspection. If a new mark is observed, record the observation and follow-up without assigning cause solely from its appearance.
Put the final observations beside the progress record