Make a renovation project easy to follow from room to room.
A renovation changes several areas at different times. Use a shared project record to show the starting condition, explain progress in each room, and give the client a clear view of the work before the final handoff.
Start your first projectRecord the starting condition
Create a project for the renovation with the site address and a short description of the scope. Take Before photos of the areas involved. A wide view establishes the room; closer photos can document the condition of a particular surface or fixture.
Use the room name in the photo comment so later readers can place the image. Keep project names specific, especially when your crew returns to the same property for a separate phase of work.
Capture progress before the next stage
Add In progress photos when the work changes in a meaningful way. Before a later stage covers an area, record the relevant views and explain what they show. JobMemo keeps the images and comments with the project; the crew decides the documentation needed for its own work.
- Name the room and the work stage in the photo comment.
- Use a consistent viewpoint for a useful before-and-after comparison.
- Add a text update when an image cannot explain why the next stage is waiting.
Room names belong in your comments and notes; there is no separate room-folder setup to maintain. The photo guide explains the available stage labels and problem flags.
Keep changes and follow-up work visible
Write a Text update when the work scope, sequence, or next visit changes. Record what was discussed and what action follows, rather than leaving the explanation only in a separate message thread.
Area: [room or part of the property] Change or question: [what needs explaining] Current state: [what has actually been done] Next action: [person and action] Related photos: [describe the views added]
Use a problem flag on a photo that needs attention. Add a follow-up note or photo when the situation changes, then clear the flag when appropriate. Flags and notes remain visible in the shared gallery and exported report.
Give the client a progress summary
End a visit with a short summary of the rooms worked on, what was completed, and what happens next. The daily site report template provides a repeatable structure you can paste into a text update.
A project admin can share a client viewing link. It opens the whole shared project record without an account. Explain the current stage in the latest note so the reader can tell the difference between an intermediate photo and a finished result.
Review the record at the final handoff
Check that the key areas have useful After photos and that outstanding items are explained. Add a closing note, update the status, and download a project PDF report if you need a saved snapshot.
A Completed project stops new photos and comments. Keep the downloaded PDF yourself; JobMemo does not save generated reports. The current record and any client feedback can help explain the job. Use project checklists to track finishing work and optional due dates. Customer signatures and automatic photo requirements for checklist items remain planned features.